Monday, June 6th, 2011 continued with heat, haze, and humidity. Discomfort Index soared to triple digits by early afternoon. The Roofers finished their shenanigans by 830am., and the roof is now complete!
Loyd arrived about 845am, and I told him that I would return after he got back from lunch at 1230pm. I headed to the FitClub for a workout, and he didn't show up until 130pm.
He completed most of the wainscoting, and only has to tack on the trim. He will finish this on Tuesday, and begin the installation of the pedestal sink and toilet.
Tuesday, June 7th 2011 The Heat Wave continues. Loyd completed the wainscoting work, and was able to install the toilet and pedestal sink, however, there is a leak in the drain of the sink. He worked until after 530pm, and the thermostat read 90 degrees in the living room. The bathroom looks terrific, and exceeds all of my hopes.